Customer Project Gallery |
Category: Jigs / Shop Projects |
full table and cabinet |
|
Project Description: New router tablecompleted, the T-track kit from Rockler worked perfectly! Used a dado blade to fit the tracks into the laminate MDF. I would have built drawers on the upper sides but need the space to change bits since theres no plate or lift. 3" dryer hose hooked up to the fence which goes into the cabinet where the shop vac is placed. Time to Build: 6-20 Hours Difficulty: Moderate |
Alternate Views:
|