
- Tools
-
Hardware
- Drawer Slides
-
Hinges
- Cabinet Hinges
- Furniture Hinges
- Box Hinges
- Specialty Hinges
- European Hinges
- Semi-Concealed Hinges
- Partial Wrap Hinges
- Demountable Hinges
- No-Mortise Hinges
- Butt Hinges
- Piano Hinges
- Quadrant Hinges
- Lid Support Hinges
- Small Box Hinges
- Pivot Hinges
- Sewing Machine Hinges
- Butler Tray Hinges
- Glass Door Hinges
- Concealed Hinges
- Hinge Accessories
- Hinge Installation Bits
-
Knobs and Pulls
- Kitchen & Bath Knobs and Pulls
- Furniture Knobs and Pulls
- Black Knobs and Pulls
- Brass Knobs and Pulls
- Bronze Knobs and Pulls
- Chrome Knobs and Pulls
- Color Knobs and Pulls
- Copper Knobs and Pulls
- Glass/Ceramic Knobs and Pulls
- Iron Knobs and Pulls
- Nickel Knobs and Pulls
- Pewter Knobs and Pulls
- Rust Knobs and Pulls
- Stainless Steel Knobs and Pulls
- White Knobs and Pulls
- Wood Knobs and Pulls
- Fasteners
- Lighting
- Bed Hardware
- Project Hardware
- Storage & Organization
- Supplies
- Only @ Rockler
- New Products
- Deals
- Outlet
-
Quick Order
- Home /
- Media /
- Woodworking Software /
- The Way to Woodwork: Woodworking's Critical Path CD from Woodworker's Journal
Overview
With the CD "Woodworking's Critical Path: The Complete Curriculum," you get a compilation of everything master woodworker Ian Kirby has taught on the subject of woodworking. Containing over 70 lessons and over a dozen projects, the CD covers everything from selecting and preparing stock; to marking joints, plus cutting them; glue-up; final assembly and finish. You'll find out how to calculate how many board feet you need for a project, how to easily read plan drawings,and how to use mock-ups for projects you design. Complete plans are included for a Mackintosh Style Chair, an Arts & Crafts Workbench, a Frame and Panel Chest, and more. As you follow the Critical Path Ian Kirby has identified as the step-by-step way to learning woodworking, you'll gain understanding of your tools, whether it's a hand plane, table saw or router, and your materials, from solid wood (plainsawn, quartersawn and more) to manufactured materials. Kirby, trained in the British Arts & Crafts tradition, also provides you with a history of this movement, plus the details of making dovetails, and instructions for frame and panels, drawers, doors and torsion boxes.
What's included
Technical Details
Some of the lessons contained on this CD include:
- Understanding Drawings
- Calculating Board Feet
- Identifying Flatsawn, Riftsawn and Quartersawn
- Understanding Wood Distortion
- Making Butt Joints
- Adding Biscuits and Splines
- Gluing and Clamping Procedures
- Measuring Tools and How They Work
- Mortise and Tenon Joints
- Hand-Cut Joints: Dovetail
- Machine-Cut Joints
- Jigs and Assembly Aids
- Tapering and Carving
- Making Drawers
- Hardware Options
- How a Plane Works
- Table Saw Safety
- Guiding Your Router
- Full-size Mock-ups
- Introduction to Drawings
- Veneering
- Parts of a Tree
- Moisture Content and Distortion
- White Oak Bookcase
- Arts & Crafts Table
- Sofa Table
- Frame and Panel Chest
- Frame and Panel Doors
- Perfect Dovetails
Plus more! Follow in the footsteps of a master woodworker on the Critical Path to learning woodworking.
- Brand: Woodworker's Journal
- Manufacturer Part Number: CD WWJ CRITICAL PATH
- Weight (lbs): 0.0300
Frequently Bought Together

Starting at: From $29.99
The Way to Woodwork DVD Series from Woodworker's Journal-Individual Volumes
Questions and Answers


Reviews
- Was this review helpful? Yes (0) No (2)
- Flag as Inappropriate
- Was this review helpful? Yes (0) No (5)
- Flag as Inappropriate
- Was this review helpful? Yes (4) No (0)
- Flag as Inappropriate
- Was this review helpful? Yes (4) No (0)
- Flag as Inappropriate
- Was this review helpful? Yes (1) No (2)
- Flag as Inappropriate
More Suggestions

Starting at: From $29.99
The Way to Woodwork DVD Series from Woodworker's Journal-Individual Volumes
You have no obligation to purchase the product once you know the price. You can simply remove the item from your cart.
You have no obligation to purchase the product once you know the price. You can simply remove the item from your cart.