Receive Free Shipping Every Day on Orders of $35 or More. Click Here to Learn How!
Receive Free Shipping Every Day. Click Here to Learn How!

Woodworker's Journal The Way to Woodwork Complete Library With Outdoor Projects and Woodworking's Critical Path CDs Zoom

Woodworker's Journal The Way to Woodwork Complete Library With Outdoor Projects and Woodworking's Critical Path CDs

Item #: 52078
The Complete Way to Woodwork series of DVDs now available at one low price!
Temporarily Oversold -
Reserve Yours Today
$89.99
Sign up for price alert Add to Wishlist Find in Store

Overview

The groundbreaking "Way to Woodwork" DVDs from Woodworker’s Journal constitute the most comprehensive woodworking instructional series available. Valuable as individual DVDs, they were conceived as a series to lay out a pathway from novice to expert and to lift every woodworker’s skills. Bundling these DVDs together provides an entertaining and educational series of videos that build on each other to present woodworking from A to Z. And as a special bonus, you'll also get "Woodworking's Critical Path," a CD with a written curriculum aligned with the videos, as well as a CD with 25 outdoor project plans from Woodworker's Journal!


The Complete "Way to Woodwork" Library Includes Ian Kirby’s Three-Volume Set, which teaches basic to advanced woodworking.

Vol. 1 Essential Starters: Design and materials, preparing stock, basic joinery and much more.
Vol. 2 Building on Basics: Next-level woodworking, frame and panels, introduction to casework and finishing touches.
Vol. 3 Advancing Your Skills: Hanging doors, making dovetails by hand and with a machine, making and fitting a dovetailed drawer.
Woodworking’s Critical Path CD — A complement to the three volumes above. The Critical Path CD has over 300 pages of in-depth how-to instruction that relate to the DVD set.


Step-by-Step to a Perfect Finish: Follow expert Michael Dresdner’s path to a perfect finish. Answer your finishing questions before you have them.


Mastering the Table Saw: Get the most out of your table saw. Use it safely and efficiently and learn advanced joinery techniques. After covering the basics, JoJo Liebeler and Rob Johnstone will teach you how to build an Arts & Crafts bedside table entirely on the table saw. (Bonus — a free downloadable plan for the bedside table.)


Getting Started in Woodturning: This brand new full-length DVD is just what you need to get going in woodturning. Woodturning is growing popularity, for good reason: It does not cost a fortune to get set up in turning, it does not take a lot of space, and you can make a turning project in an afternoon!

Plus a bonus CD of 25 Outdoor Projects from Woodworker's Journal

What's included

(1) Woodworker's Journal Complete Collection
(1) Woodworker's Journal 25 Outdoor Projects CD
(1) The Way to Woodwork: Woodworking's Critical Path CD from Woodworker's Journal

Technical Details

  • Weight (lbs): 1.0800
  • Topic: Beginning Turning, Dovetails, Furniture
Feedback X